Here are a few photos of Kirkstone G block which will be our new (temporary) home from September 2009 – June 2010!
The room at the top right of the first photo (side facing the camera) will be the broadcast studio and the one left of it engineering/racks. The office is on the other side of the block, to the rear of the broadcast studio. Second photo shows the temporary students union reception being constructed.


